Home Morrison Bridge closed Sunday for lift span work
 

Keywords :   


Morrison Bridge closed Sunday for lift span work

2015-01-29 17:30:56| PortlandOnline

The Morrison Bridge will be closed to traffic on Sunday, February 1 from 7 a.m. until as late as 7 p.m. during an inspection and maintenance work on the lift span deck. The work is related to problems with deck panels that were installed in 2011 2012.

Tags: work sunday closed bridge

Category:Construction and Maintenance

Latest from this category

All news

»
23.11PlayStationVitaPCH-2000
23.11GB
23.11 Malbon
23.11PING PEARL GATES
23.11WATCH
23.11L
23.11Tetsuya_SP2 DMC
23.116
More »