je.st
news
Tag: sewer
FIN-3.60 - Sewer System Debt Redemption Fund - Fund 609
2016-09-28 23:10:46| PortlandOnline
BCP-FIN-3.60 PDF Document, 67kbCategory: Fund Statements of Purpose
Funds, Sewer System Operating Fund - Fund 600
2016-09-28 00:40:16| PortlandOnline
BCP-FIN-3.51
Tags: system
operating
funds
fund
FIN-3.51 - Sewer System Operating Fund - Fund 600
2016-09-28 00:39:27| PortlandOnline
BCP-FIN-3.51 PDF Document, 93kbCategory: Fund Statements of Purpose
Tags: system
operating
fund
operating system
Tabor Sewer Repair Project Update
2016-09-24 01:58:46| PortlandOnline
There will be construction phases at each location; video inspection, saw-cutting, spot repairs, manhole replacement, pipe installation, lateral connection from each building to the curb, stormwater inlet replacement, temporary paving, final trench paving and restoration.
Tags: project
update
repair
sewer
Powell Sewer Repair Project Update
2016-09-24 01:57:20| PortlandOnline
There will be construction phases at each location including video inspection, saw-cutting, spot repairs, manhole replacement, pipe installation, lateral connection from each building to the curb, stormwater inlet replacement, temporary paving, final trench paving and restoration.
Tags: project
update
repair
powell
Sites : [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] next »