je.st
news
Tag: bridge
Westbound lane on Burnside Bridge to be closed at off-peak hours for utility work
2017-07-10 19:54:33| PortlandOnline
Short sections of the outside westbound lane on the Burnside Bridge will be closed at off-peak travel times from July 12 - August 31, 2017 so that Century Link can upgrade utility conduits on the bridge.
Tags: work
hours
closed
bridge
Lane closures for Broadway Bridge repairs begin July 3
2017-07-04 00:11:16| PortlandOnline
The two outside traffic lanes on the Broadway Bridge will close on Monday, July 3 after 9 a.m. for a six-month project that will replace four large steel wheels that help open and close the drawbridge for ships to pass.
Traffic Alert: Late night work on Broadway Bridge June 27-28
2017-06-28 01:50:19| PortlandOnline
A survey crew will be working on the Broadway Bridge from 11 pm until as late as 4 am on June 27-28, and possibly on June 29 in preparation for the Rall Wheel replacement.
Morrison Bridge traffic lanes shift to north on June 28
2017-06-28 01:45:40| PortlandOnline
The contractor installing a new deck on the Morrison Bridge lift span will shift traffic lanes from the south to the north side of the bridge in the early morning of Wednesday, June 28, from 3 a.m. to 6 a.m.
Tags: june
north
traffic
bridge
Broadway Bridge lane closures postponed
2017-06-26 17:20:06| PortlandOnline
Closure of the outside traffic lanes on the Broadway Bridge, which was scheduled to begin on Monday, June 26 at 9 a.m., will be postponed several days.
Tags: bridge
lane
broadway
closures
Sites : [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] [38] [39] [40] [41] [42] [43] [44] next »