je.st
news
Tag: break
BASF And PETRONAS Break Ground On Highly Reactive Polyisobutene (HR-PIB) Production Plant In Gebeng, Kuantan, Malaysia
2016-03-18 06:07:10| surfacefinishing News Articles
Deputy Minister of the Malaysian Ministry of International Trade and Industry, Dato' Lee Chee Leong, officiated the ground-breaking ceremony for the highly reactive polyisobutene (HR-PIB) production plant at the BASF PETRONAS Chemicals Sdn Bhd integrated site in Gebeng, Kuantan, Malaysia today.
Tags: production
highly
ground
break
Apple Engineers May Quit if Forced to Break iPhone Encryption
2016-03-18 05:04:27| PC Magazine Software Product Guide
Multiple Apple employees told the New York Times they would resist a direct order to create an encryption backdoor.
Tags: break
apple
forced
engineers
Apple Engineers May Quit if Forced to Break iPhone Encryption
2016-03-18 03:04:16| PC Magazine Security Product Guide
Multiple Apple employees told the New York Times they would resist a direct order to create an encryption backdoor.
Tags: break
apple
forced
engineers
Spring Break Construction Project on Gregory between 1st and 2nd will have Eastbound closed
2016-03-16 15:11:34| CUMTD Alerts
During Spring break the U of I will use this time to repair curb on the South Side of Gregory between 1st and 2nd and closing all Eastbound traffic.Starting Saturday 03/19 and lasting for 1 week Buses will need to reroute. 1/100 Yellow Northbound: 1st ro Armory to Arbor to Gregory and regular route.10 Gold East: 1st to Armory to Arbor to Gregory and regular route.Westbound on Gregory will be open.
Tags: will
project
construction
break
Spring Break Construction Project on Gregory between 1st and 2nd will have Eastbound closed
2016-03-16 15:11:34| CUMTD Alerts
During Spring break the U of I will use this time to repair curb on the South Side of Gregory between 1st and 2nd and closing all Eastbound traffic.Starting Saturday 03/19 and lasting for 1 week Buses will need to reroute. 1/100 Yellow Northbound: 1st ro Armory to Arbor to Gregory and regular route.10 Gold East: 1st to Armory to Arbor to Gregory and regular route.Westbound on Gregory will be open.
Tags: will
project
construction
break
Sites : [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] next »