Home Stumped by the Code? Requirements for Identifying the High-Leg of a 3-Phase, 4-Wire Connected System
 

Keywords :   


Stumped by the Code? Requirements for Identifying the High-Leg of a 3-Phase, 4-Wire Connected System

2013-10-15 22:36:59| Electrical Construction & Maintenance

By Mike Holt, NEC Consultant Q. What kind of marking does the Code require to identify the high-leg of a 3-phase, 4-wire delta connected system? read more

Tags: system code requirements connected

Category:Construction and Maintenance

Latest from this category

All news

»
05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Forecast Discussion Number 6
05.11Tropical Storm Rafael Wind Speed Probabilities Number 6
05.11Tropical Storm Rafael Public Advisory Number 6
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Tropical Storm Rafael Forecast Advisory Number 6
05.11Why colouring clothes has a big environmental impact
05.11Atlantic Tropical Weather Outlook
More »