Home Stumped by the Code? Requirements for Identifying the High-Leg of a 3-Phase, 4-Wire Connected System
 

Keywords :   


Stumped by the Code? Requirements for Identifying the High-Leg of a 3-Phase, 4-Wire Connected System

2013-10-15 22:36:59| Electrical Construction & Maintenance

By Mike Holt, NEC Consultant Q. What kind of marking does the Code require to identify the high-leg of a 3-phase, 4-wire delta connected system? read more

Tags: system code requirements connected

Category:Construction and Maintenance

Latest from this category

All news

»
19.05Eastern North Pacific Tropical Weather Outlook
19.05Atlantic Tropical Weather Outlook
19.05Fujitsu sacked boss at height of Horizon scandal
19.05Atlantic Tropical Weather Outlook
19.05Eastern North Pacific Tropical Weather Outlook
19.05Businessman Tony O'Reilly dies after short illness
18.05Eastern North Pacific Tropical Weather Outlook
18.05Atlantic Tropical Weather Outlook
More »