Home Tube and Pipe Beveler preps small bore heavy wall tubes.
 

Keywords :   


Tube and Pipe Beveler preps small bore heavy wall tubes.

2015-05-29 14:31:06| Industrial Newsroom - All News for Today

Developed for machining highly alloyed tubes, ESCO C-HOG MILLHOG® O.D. Clamping End Prep Tool features rugged clamp that mounts onto outside of tube, evenly distributing holding power to assure chatter-free end prep. Tool is 1 ¾ in. wide to fit in tight areas and is equipped with 1.07 hp pneumatic motor that runs at 130 rpm. Capable of prepping tube and pipe from ½–3 in. O.D., tool is suited for high-purity piping systems requiring 37 ½° bevels, flat-facing, J-preps, or orbital welding.

Tags: small wall heavy tube

Category:Industrial Goods and Services

Latest from this category

All news

31.10Consolidated Financial Statements for the six-month period ended September 30, 2024
31.10Notice regarding the revision of the business results forecasts
Industrial Goods and Services »
05.11Registration Now Open for RadTech 2025
05.11Atlantic Tropical Weather Outlook
05.11Eastern North Pacific Tropical Weather Outlook
05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Public Advisory Number 7A
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Vodafone-Three merger could get green light, watchdog says
05.11Altice USA residential video RGUs down 77,000 in 3Q 2024
More »