Home technically
 

Keywords :   


Tag: technically

Aker Solutions provides cost effective and technically advanced subsea umbilicals worldwide.

2013-03-20 04:58:09| oilandgasonline News Articles

The Erha North Phase 2 development is an extension of the existing Erha subsea system and infrastructure located approximately 97 kilometres offshore Nigeria in water depths between 1 000 and 1 200 metres.

Tags: advanced cost effective solutions

 

EPRI calculates technically recoverable US riverine hydrokinetic potential at 3% of annual electricity demand

2013-02-13 14:30:21| Green Car Congress

Tags: potential annual demand electricity

 

Sites : [1] [2] [3]