je.st
news
Tag: phase
Arup installs offshore malampaya depletion compression platform at Malampaya Phase 3
2015-09-02 01:00:00| Offshore Technology
Engineering and consulting firm Arup has completed installation of the offshore Malampaya Depletion Compression Platform (DCP) at Shell's Malampaya Phase 3 gas field in the West Philippine Sea off the coast of Palawan.
Tags: phase
platform
compression
offshore
DOT awards Agnik Phase II research contract for next generation insurance solutions for connected cars
2015-09-01 21:55:32| Green Car Congress
Tags: research
cars
solutions
insurance
Second phase begins for Verrazano Bridge repairs
2015-09-01 00:42:29| Railroads - Topix.net
Drivers will have to pay extra attention on the Verrazano-Narrows Bridge now that a major reconstruction project has entered its next phase. MTA Bridges and Tunnels announced that the second stage of construction work in a $235.7 million project to replace the 51-year-old bridge's upper deck began on Aug. 29. For the duration of the second phase of the project, all current lanes of traffic will continue to be maintained during peak weekday morning and afternoon drive times, according to the MTA, which indicated that a moveable barrier will be used to mark the lanes.
Tags: phase
bridge
begins
repairs
Miniature Low Phase Noise OCXO measures 9.7 x 7.5 mm.
2015-08-31 14:31:06| Industrial Newsroom - All News for Today
Supplied in 4-pad plastic package with fiberglass base, IQOV-71 series comes in standard frequencies of 10, 12.8, 19.2, 20, 24.576, 25, 30.72, 38.88, 40, 49.152, and 50 MHz. Power consumption is <1 W typ during warm up, which takes ~3 min, and <0.4 W in steady state, and low frequency stabilities reach down to ±10 ppb over -20 to +70°C operating range or ±20 ppb from -40 to +85°C. HCMOS or Clipped sinewave output, with operating voltages specified at 3.3 or 5.0 V, are standard.
New traffic shift planned as Verrazano Bridge enters second construction phase
2015-08-28 16:28:11| Railroads - Topix.net
The Metropolitan Transportation Authority announced that, beginning Saturday, Aug. 29, new traffic shifts will be in place to facilitate the second stage of the bridge's upper-deck replacement project. Upper-level lane closures in both directions will be needed on Friday night, Aug. 28, to allow for the transition.
Tags: construction
phase
traffic
bridge
Sites : [102] [103] [104] [105] [106] [107] [108] [109] [110] [111] [112] [113] [114] [115] [116] [117] [118] [119] [120] [121] next »