je.st
news
Tag: repair project
Powell Sewer Repair Project Construction Update: May 11, 2016
2016-05-11 22:20:24| PortlandOnline
Construction will start soon on Environmental Services SE Powell Sewer Repair Project
Tags: project
update
construction
repair
Piedmont Sewer Repair Project Update: May 6, 2016
2016-05-09 18:47:34| PortlandOnline
Construction hours are from 7:00 a.m. to 6:00 p.m. Monday through Friday. Below is the estimated construction schedule for the next three weeks. Please be aware that this schedule is subject to change due to a variety of factors, including conditions underground, weather, traffic impacts, subcontractor schedules and availability of materials.
Tags: project
update
repair
sewer
Lower Powell Green Street and Sewer Repair Project Update: May 5, 2016
2016-05-06 02:00:03| PortlandOnline
Work has started on an Environmental Services project to replace and repair 4,508 feet of aging sewer pipe. The work includes constructing 22 green street planters and planting trees to absorb rain and reduce stormwater runoff. The project will keep about 1.6 million gallons of stormwater out of sewers annually, increase sewer system capacity and reduce basement backups.
Tags: street
project
lower
update
NW Hermosa Sewer Repair Project Update: April 29, 2016
2016-05-02 22:48:36| PortlandOnline
Environmental Services is working on a project to repair 100-year old sewer pipes along NW Hermosa Boulevard between NW Macleay Boulevard and NW Monte Vista Terrace. Since the project began in late March, crews have installed six manholes and repaired laterals that connect properties to the sewer. Crews are replacing stormwater inlets and inlet pipes that connect to the combined sewer system. Next crews will repair over 550 feet of public sewer main in the street.
Tags: april
project
update
repair
Lower Powell Green Street and Sewer Repair Project Update: April 22, 2016
2016-04-25 18:43:14| PortlandOnline
Environmental Services began construction on a project to replace and repair 4,508 feet of aging sewer pipe. The work includes constructing 22 green street planters and planting trees to absorb rain and reduce stormwater runoff. The project will keep about 1.6 million gallons of stormwater out of sewers annually, increase sewer system capacity and reduce basement backups.
Tags: april
street
project
lower
Sites : [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] next »