je.st
news
Tag: sewer project
Lower Powell Green Street and Sewer Repair Project Update: November 9, 2016
2016-11-10 23:02:03| PortlandOnline
As part of the Tabor to River Program, Environmental Services will soon complete construction on the Lower Powell Green Street and Sewer Project. The work includes installing 22 green street planters, planting 11 trees, and repairing or replacing 4,508 feet of public sewer pipe. These improvements will extend the service life of our sewer system and protect public health, property and the environment by reducing the possibility of sewage releases into streets, homes and businesses.
Tags: november
street
project
lower
SE Hawthorne-Salmon Area Green Street and Sewer Project: November 11, 2016
2016-11-08 00:55:47| PortlandOnline
Environmental Services continues construction on the SE Hawthorne-Salmon Area Green Street and Sewer Project. The project includes installing 23 green street planters, planting 100 street trees, and repairing or replacing over 10,000 feet of public sewer pipe. These improvements will extend the service life of our sewer system and protect public health, property and the environment by reducing the possibility of sewage releases into streets, homes and businesses.
Tags: area
november
street
project
Piedmont Sewer Repair Project Update: November 4, 2016
2016-11-08 00:53:13| PortlandOnline
Night work on North Lombard Street between North Kerby and Vancouver avenues is scheduled to begin next Monday, November 7, through Friday, November 18
Tags: november
project
update
repair
Southeast Interceptor Sewer Repair Project: Proposed night work
2016-11-08 00:48:07| PortlandOnline
Environmental Services has nearly completed design work for an inner southeast Portland repair of a deep interceptor sewer line that is deteriorating due to age. The repairs will extend the life of the sewer and protect public health, water quality and the environment. The city built the large-diameter Southeast Interceptor in 1954. It runs parallel to the Willamette River under inner southeast neighborhoods and is between 5 to 6 feet wide and 25 to 54 feet below the surface.
Tags: work
night
project
proposed
Hollywood/Grant Park Sewer Repair Project Update
2016-11-04 23:24:22| PortlandOnline
Currently our contractor is finishing up the night work on NE Halsey. The night pipe work is expected to last through the week of November 14. Final trench paving will take place at a later date once temperatures and dry weather allow this phase of the work to be completed.
Tags: project
park
update
repair
Sites : [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] next »