Home sunday
 

Keywords :   


Tag: sunday

Precision Press will be First to Install New Goss Sunday Vpak Packaging Press Model

2013-04-24 17:11:00| Packaging Gateway

Precision Press, an innovative US packaging and label producer for the food, beverage and consumer markets, will be the first in the world to install the new Goss Sunday Vpak web offset printing system.

Tags: press model sunday install

 

Demonstration Week Gives Packaging Printers a First-hand Look at Sunday Vpak Press Capabilities

2013-04-24 17:10:00| Packaging Gateway

Packaging producers from Europe and North America saw a Goss Sunday Vpak press system print with high quality at high speeds on wide webs during a series of demonstrations at the Goss International headquarters in the United States.

Tags: week press sunday packaging

 
 

Goss Ships First Sunday Vpak Packaging Press

2013-04-24 17:07:00| Packaging Gateway

With intensive print testing completed throughout October at its headquarters in Durham, New Hampshire, Goss International started shipping its first Sunday Vpak packaging press on schedule to Precision Press in Minnesota (US).

Tags: press sunday ships packaging

 

Sunday Vpak: a Variable-sleeve Web Offset Platform Delivering Productivity

2013-04-24 17:03:00| Packaging Gateway

Specialized Goss Sunday Vpak presses were designed from the ground up to allow flexible packaging, folding carton, pre-print and label producers to fully exploit the productivity, print quality, process automation and short-run agility advantages

Tags: web sunday platform offset

 

Eastbound Broadway Bridge lane closed for Sunday run

2013-04-11 22:43:40| PortlandOnline

The outside eastbound lane of the Broadway Bridge will be closed to traffic on Sunday, April 14 from 4:30 a.m. to 9:30 a.m. during the Race for the Roses running event. At least one traffic lane will remain open in each direction as well as both bridge sidewalks. The 17-Holgate/Broadway bus route will detour to the Steel Bridge westbound and the Burnside Bridge eastbound while the Broadway Bridge lane is closed. The bridge lift span will not open for river traffic from 5:30 a.m. until 8:30 a.m.

Tags: run sunday closed bridge

 

Sites : [132] [133] [134] [135] [136] [137] [138] [139] [140] [141] [142] [143] [144] [145] [146] [147] [148] [149] [150] next »