je.st
news
Tag: solution
Noshok Solution for Pump Shut-Off Protection
2013-10-29 06:00:00| Industrial Newsroom - All News for Today
Berea, Ohio – NOSHOK provides a variety of application-focused assemblies to the water & wastewater industry, including an all non-metallic diaphragm seal & pressure transmitter/switch. This tested and proven solution is used in multiple municipalities, and replaces much larger & heavier gauge/switch/diaphragm seal assemblies for pump shut-off protection.<br /> <br /> This assembly delivers a high level of repeatability and durability, and includes an electronic indicating pressure ...This story is related to the following:Test and Measuring InstrumentsPressure Transducers | Diaphragm Seals |
Tags: protection
solution
pump
shutoff
Priority Power Management Signs Agreement To Provide On-Site Power Generation Solution To Atlantic Midstream, LLC
2013-10-29 02:09:44| oilandgasonline News Articles
Priority Power Management, LLC (“PPM”), a Texas-based leading independent energy management and consulting services firm, has entered into an agreement with Atlantic Midstream, LLC (“Atlantic”) to develop 3.6 MW of on-site natural gas-fired generation to power Atlantic’s new Gas Processing and Treating plant located in Reeves county, Texas
Tags: provide
power
management
agreement
Priority Power Management Signs Agreement To Provide On-Site Power Generation Solution To Atlantic Midstream, LLC
2013-10-29 02:09:44| plantautomation News Articles
Priority Power Management, LLC (“PPM”), a Texas-based leading independent energy management and consulting services firm, has entered into an agreement with Atlantic Midstream, LLC (“Atlantic”) to develop 3.6 MW of on-site natural gas-fired generation to power Atlantic’s new Gas Processing and Treating plant located in Reeves county, Texas
Tags: provide
power
management
agreement
Bombardier to implement INTERFLO 250 ERTMS solution for Chiles EFE
2013-10-29 01:00:00| Railway Technology
Bombardier Transportation has won a $21m contract from Chilean national railway Empresa de los Ferrocarriles del Estado (EFE) to implement its INTERFLO 250 European Rail Traffic Management System (ERTMS) Level 1 solution.
Tags: solution
implement
bombardier
chiles
EIVA System Solution Leads the Way for A2SEA Jack-Ups
2013-10-28 18:05:00| Offshore Technology
EIVA has successfully completed the factory acceptence test (FAT) of the second of two complete navigation and leg penetration / barge displacement monitoring system solutions to be delivered to installation and service provider for offshore wind far
Tags: system
solution
leads
system solution
Sites : [513] [514] [515] [516] [517] [518] [519] [520] [521] [522] [523] [524] [525] [526] [527] [528] [529] [530] [531] [532] next »