je.st
news
Tag: construction project
Powell Sewer Repair Project Construction Update: October 10, 2017
2017-10-10 18:44:14| PortlandOnline
Environmental Services is continuing construction on the Powell Sewer Repair Project in your neighborhood. This project will replace and repair aging public sewer pipe ranging from 60 to 104 years old. Repairing and replacing aging sewer pipes protects water quality, public health and the environment.
Tags: october
project
update
construction
Fanno Pressure Sewer Improvement Project Construction Update: October 6, 2017
2017-10-07 01:48:21| PortlandOnline
This project has replaced all 19 maintenance access structures in nine locations in the Garden Home area, as well as a pressure monitoring and recording system station off SW Railroad Street. These upgrades will ensure that the Fanno Basin Sewer System will continue to handle all wastewater flows year-round and provide better monitoring of the entire sewer system in the area. It will protect public health and the health of the Fanno Creek Watershed.
Tags: october
project
update
construction
Fanno Pressure Sewer Improvement Project Construction Update: September 20, 2017
2017-09-20 23:49:31| PortlandOnline
The Fanno Pressure Sewer Improvement Project has replaced nine of the 19 maintenance access structures planned for replacement in nine locations in the Garden Home are. The project has also installed a pressure monitoring and recording system station near SW Railroad Street. These upgrades will ensure that the Fanno Basin Sewer System will continue to handle all wastewater flows year-round and provide better monitoring of the entire sewer system in the area.
Tags: september
project
update
construction
Tabor Sewer Repair Project Construction Update Sept 15, 2017
2017-09-16 00:46:27| PortlandOnline
Tags: project
update
construction
repair
Alder Pump Station Upgrade Project: Construction update
2017-09-15 01:25:53| PortlandOnline
On-site mobilization continues on the Alder Pump Station site at SE Water Avenue and SE Alder Street. Upgrades to the pump station will improve reliability and increase pumping capacity, which will help prevent sewage releases into buildings and streets and combined sewage and stormwater overflows to the Willamette River.
Tags: project
update
construction
station
Sites : [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] next »