je.st
news
Tag: project
Hollywood/Grant Park Sewer & Stormwater Project Update
2016-10-06 23:06:02| PortlandOnline
Cured-in-place pipe lining is schedule to occur in multiple locations throughout the project. Our contractor is now beginning the larger diameter cured in place pipe lining, which requires a longer cure time. This work will last into the evening hours and some into the early morning. You will receive a notice on your door with the date and hours of the operation for your area. Please limit your water usage during the process.
Tags: project
park
update
sewer
Powell Sewer Repair Project Update
2016-10-06 23:00:04| PortlandOnline
There will be construction phases at each location including video inspection, saw-cutting, spot repairs, manhole replacement, pipe installation, lateral connection from each building to the curb, stormwater inlet replacement, temporary paving, final trench paving and restoration.
Tags: project
update
repair
powell
Tabor Sewer Repair Project Update
2016-10-06 22:58:02| PortlandOnline
There will be construction phases at each location; video inspection, saw-cutting, spot repairs, manhole replacement, pipe installation, lateral connection from each building to the curb, stormwater inlet replacement, temporary paving, final trench paving and restoration.
Tags: project
update
repair
sewer
Sign Up to Receive Project Updates
2016-10-06 19:30:18| PortlandOnline
Enter your contact information if you would like to receive monthly Washington Park Reservoir Improvements Project updates by e-mail.
Tags: sign
receive
project
updates
GBCI, Environmental Defense Fund Establish Investor Confidence Project as Global Standard
2016-10-06 14:00:00| Coatings World Breaking News
Tags: standard
project
global
environmental
Sites : [531] [532] [533] [534] [535] [536] [537] [538] [539] [540] [541] [542] [543] [544] [545] [546] [547] [548] [549] [550] next »