Home project
 

Keywords :   


Tag: project

EDF Renewable Energy And BlackRock Close On The Sale Of 50 Percent Interest In The 200 MW Longhorn Wind Project In Texas

2015-10-05 06:54:15| pollutiononline Home Page

EDF Renewable Energy (EDF RE) has closed on the transaction to sell a 50 percent interest in the 200 megawatt (MW) Longhorn Wind Project to a fund managed by BlackRock’s Infrastructure Investment Group (“BlackRock Infrastructure”)

Tags: in close sale interest

 

TxDOT project updates for the week of Oct. 5

2015-10-05 05:50:56| Food - Topix.net

Here's a look at work planned in the district during the week of October 5, 2015. These schedules are subject to change due to weather conditions, equipment failure or other unforeseen issues.

Tags: week project oct updates

 
 

Columbia Gas Transmission commissions East Side Expansion Project in US

2015-10-05 01:00:00| Hydrocarbons Technology

Columbia Gas Transmission, a subsidiary of Columbia Pipeline Group (CPG) has brought the East Side Expansion Project (ESE) online in the US.

Tags: us side project east

 

Balch Sewer Project Update

2015-10-02 20:07:20| PortlandOnline

Environmental Services is replacing sewer pipes in poor condition in the area bounded by NW Yeon Avenue, NW 29th Avenue, NW Nicolai Avenue, and NW St. Helens Road. The project will relieve street flooding and basement sewer backups. The work includes diverting stormwater to the Balch Conduit sewer pipe, and replacing dams in the Balch outfall pipe to prevent Willamette River water from backing up into the pipe during heavy rain events.

Tags: project update sewer balch

 

Sellwood-Moreland Sewer Rehab Project Construction Update: October 1, 2015

2015-10-02 20:03:30| PortlandOnline

Environmental Services is repairing or replacing about 25,000 feet of public sewer pipes in the Sellwood-Moreland neighborhood that are between 80 and 100 years old and failing due to age. This project will help protect the public and the environment by reducing the possibility of costly breaks, leaks, blockages and sewage releases to homes, businesses and streets.

Tags: october project update construction

 

Sites : [884] [885] [886] [887] [888] [889] [890] [891] [892] [893] [894] [895] [896] [897] [898] [899] [900] [901] [902] [903] next »