je.st
news
Tag: package
Column: Got water? 'Yes' vote on bond package will help ensure we do
2016-01-25 06:46:50| Waste Management - Topix.net
One of the least discussed but most important elements of the Connect NC Bond package is the $309 million designated for clean water and sewer infrastructure. Demographers report that North Carolina is growing at the rate of about 100,000 people per year, and these water and sewer bond monies are urgently needed for aging and inadequate municipal and county systems.
Reverse Mount LEDs feature inner dome lens in 1206 package.
2016-01-22 14:31:06| Industrial Newsroom - All News for Today
By eliminating typical Yoke Lead or Z-Bend leads, subminiature XZxx55W-A2RT Series offers engineers true chip-type surface mount LEDs. Construction of inner dome lens delivers optimal optical characteristics that make LEDs suitable for any application demanding uniform light spread and high intensity output. With viewing angle of 70°, light emission is narrow enough to be paired with light pipe applications, while being wide enough to provide ample coverage for backlighting of icons and text.
Tags: feature
package
reverse
mount
ONI Budget Add Package Template
2016-01-22 01:16:57| PortlandOnline
Word template for BAC members to use to submit any budget add ideas to the BAC for 1/25/16 meeting Word Document, 29kbCategory: Budget Work Group Key Documents
Tags: add
package
budget
template
Low-Noise C-Band VCO comes in SUB-L package.
2016-01-21 14:31:05| Industrial Newsroom - All News for Today
Operating from 4,345–4,355 MHz within 1–4 Vdc tuning voltage range, SMV4350A-LF features phase noise performance of -110 dBc/Hz @ 100 kHz offset and average sensitivity of 50 MHz/V. RoHS-compliant VCO (Voltage-Controlled Oscillator) delivers -0.5 ±2.5 dBm output power into 50 Ω load while operating over -40 to +85°C range. Consuming 20 mA while operating from 5.0 Vdc supply, product features second harmonic suppression of -25 dBc typ and comes in 0.3 x 0.3 x 0.08 in. package.
Tags: package
vco
lownoise
cband
BAC Approved 5% Cut Package
2016-01-20 19:30:43| PortlandOnline
Summary of 5% cut package developed and approved by the BAC at the 1/19/16 meeting. PDF Document, 185kbCategory: Budget Work Group Key Documents
Tags: cut
approved
package
bac
Sites : [73] [74] [75] [76] [77] [78] [79] [80] [81] [82] [83] [84] [85] [86] [87] [88] [89] [90] [91] [92] next »