je.st
news
Tag: project design
Taggart Outfall Sewer Repair Project: Design continues
2016-09-22 01:41:11| PortlandOnline
Environmental Services is designing a project to repair about 3,700 feet of the 105-year-old brick Taggart Outfall sewer so that it can operate for another hundred years.
Tags: design
project
repair
continues
Project Design
2016-08-04 21:29:24| PortlandOnline
Tags: design
project
project design
design project
Sunnyside East Green Street and Sewer Project: Halfway through design and presentation on June 2
2016-05-28 00:38:28| PortlandOnline
In spring 2015, Environmental Services began designing a project in your neighborhood to repair or replace 4,500 feet of 100-year-old public sewer pipe that is deteriorating due to age, and add 18 green street planters to remove 2.4 million gallons of stormwater from sewer pipes. These improvements will protect public health, property and the environment and reduce the possibility of sewage releases into streets, homes and businesses.
Southeast Interceptor Sewer Repair Project: Design update
2016-02-19 22:55:20| PortlandOnline
Environmental Services is designing a project in inner southeast Portland to repair a deep interceptor sewer line that is deteriorating due to age. The project will extend the life of the sewer and protect public health, water quality and the environment. The city built the large-diameter Southeast Interceptor in 1954. It runs parallel to the Willamette River under inner southeast neighborhoods at depths ranging from 30 to 54 feet.
Tags: design
project
update
repair
IKM Ocean Design wins contract for Johan Castberg subsea project in Barents Sea
2016-01-14 01:00:00| Offshore Technology
IKM Ocean Design has secured a contract with Statoil to provide pre-FEED and FEED services for the Johan Castberg subsea project, 100km north of the Snhvit-field in the Barents Sea, Norway.
Tags: design
project
sea
contract