Home replacement project
 

Keywords :   


Tag: replacement project

Balch Conduit Support Sewer Replacement Project Update: July 22, 2015

2015-07-22 20:43:13| PortlandOnline

Environmental Service has completed designing a project that will replace sewer pipes in poor condition and relieve street flooding and basement sewer backups in the area bounded by NW Yeon Avenue, NW 29th Avenue, NW Nicolai Avenue, and NW St. Helens Road. The project includes diverting stormwater to the Balch Conduit sewer pipe, and replacing dams in the Balch Outfall pipe to prevent Willamette River water from backing up into the pipe during heavy rain events.0

Tags: support july project update

 

Construction for Hannah Mason Pump Station (Fulton Pump Station Replacement Project) to Disrupt Traffic on SW Nevada Street

2015-07-20 20:27:06| PortlandOnline

Tags: street project construction station

 
 

TRAFFIC ADVISORY 7/17/2015: Construction for Hannah Mason Pump Station (Fulton Pump Station Replacement Project) to Disrupt Traffic on SW Nevada Street

2015-07-17 21:34:35| PortlandOnline

PDF Document, 129kbCategory: 2015 Media Releases

Tags: street project construction station

 

SE Division Place and 6th Avenue Sewer Replacement Project Update: July 10, 2015

2015-07-13 22:37:21| PortlandOnline

Environmental Services your sewer and stormwater service provider will replace and upsize about 270 feet of public sewer pipes on SE Division Place between SE 6th and SE 7th avenues. The pipes are between 95 and 106 years old. This project will increase sewer capacity and reduce the risks of sewage releases to homes and streets.

Tags: place july project update

 

Balch Consolidated Conduit Support Sewer Replacement Project Update

2015-07-09 20:39:53| PortlandOnline

Environmental Service has completed designing a project that will replace and abandon pipes in poor condition and relieve street flooding and basement sewer backups in the area bounded by NW Yeon Avenue, NW 29th Avenue, NW Nicolai Avenue, and NW St. Helens Road. The project includes diverting stormwater to the Balch Consolidation Conduit sewer pipe, and replacing dams in the Balch Outfall pipe to prevent Willamette River water from backing up into the pipe during heavy rain events.

Tags: support project update replacement

 

Sites : [1] [2] [3] [4] [5] [6] [7] [8] next »