Home se
 

Keywords :   


Tag: se

ROW - SE 44th Ave between SE Holgate and SE Long

2018-08-17 02:28:51| PortlandOnline

Block Party 8/18 PDF Document, 389kbCategory: Inner Southeast Portland (SEUL)

Tags: se long ave row

 

ROW - SE Foster Rd from SE 86th Ave to SE 86th Ct

2018-08-17 02:17:40| PortlandOnline

Construction of water facilities 8/19 - 8/20 PDF Document, 561kbCategory: East Portland (EPNO)

Tags: to se ave ct

 
 

SE Powell Blvd from SE 119th Ave to SE 138th Ave

2018-08-11 02:16:53| PortlandOnline

Construction - grinding and paving road, and stormwater line construction for up to 92 nights between 10/1/2018 and 10/31/2020 PDF Document, 1,052kbCategory: East Portland (EPNO)

Tags: se ave blvd powell

 

SE 12th Ave and SE Belmont

2018-08-11 02:04:51| PortlandOnline

Construction - Concrete pour for 10 days between 8/10 and 10/16 PDF Document, 580kbCategory: Inner Southeast Portland (SEUL)

Tags: se ave 12th belmont

 

ROW - SE Yamhill between SE Water and SE 2nd Ave

2018-08-11 01:54:33| PortlandOnline

Central Eastside Street Fair 8/18 PDF Document, 391kbCategory: Inner Southeast Portland (SEUL)

Tags: se water 2nd ave

 

Sites : [1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11] [12] [13] [14] [15] [16] [17] next »