Home AVEVA Reduces Design Time by 80% for Burgasnefteproekt
 

Keywords :   


AVEVA Reduces Design Time by 80% for Burgasnefteproekt

2014-01-09 06:00:00| Industrial Newsroom - All News for Today

AVEVA Laser Modeller scanning technology dramatically increases production efficiency<br /> <br /> Moscow, Russia &ndash; AVEVA today announced that Burgasnefteproekt, an engineering company in the field of petrochemicals, has achieved significant cost savings using AVEVA Laser Modeller. Burgasnefteproekt recently acquired the AVEVA software and used it to capture the as-built asset and create a 3D model of an existing flaring system. This is part of a revamp project to rebuild the system and ...This story is related to the following:SoftwareScanning Software | Model Digitizing & Scanning Services

Tags: for time design reduces

Category:Industrial Goods and Services

Latest from this category

All news

01.10Boosting Membership Value
Industrial Goods and Services »
07.10Perfect storm blocking thousands of desperately needed social homes
07.10Hurricane Milton Public Advisory Number 6A
07.10Summary for Hurricane Milton (AT4/AL142024)
07.10Atlantic Tropical Weather Outlook
07.10Eastern North Pacific Tropical Weather Outlook
07.10Can selling off homes for $1 solve urban blight?
06.10Hurricane Milton Potential Storm Surge Flooding Map
06.10Hurricane Milton Probabilistic Storm Surge Graphics
More »