Home Abengoa Yield's Mojave 280 MW Gross Solar Plant Declares Commercial Operation
 

Keywords :   


Abengoa Yield's Mojave 280 MW Gross Solar Plant Declares Commercial Operation

2014-12-02 18:09:55| Paper - Topix.net

Abengoa Yield , the sustainable total return company that owns a diversified portfolio of contracted assets in the energy and environment sectors, today announced that Mojave, the 280 MW gross solar plant located in California, has declared commercial operation on December 1. Located 100 miles northeast of Los Angeles, Mojave generates clean electricity to power approximately 90,000 households in California, preventing the emission of 350,000 tons of CO2 annually. The project has generated thousands of jobs, peaking at over 2,200 positions during the construction phase.

Tags: commercial operation plant gross

Category:Materials

Latest from this category

All news

»
05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Wind Speed Probabilities Number 7
05.11Tropical Storm Rafael Public Advisory Number 7
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Tropical Storm Rafael Forecast Advisory Number 7
05.11Boeing strike ends as workers back 38% pay rise deal
05.11Tropical Storm Rafael Public Advisory Number 6A
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
More »