Home Apache begins production at wells in Western Desert, Egypt
 

Keywords :   


Apache begins production at wells in Western Desert, Egypt

2013-05-09 01:00:00| Hydrocarbons Technology

US-based Apache has begun production at a combined rate of 1,625 barrels of oil and 18.7m cubic ft (MMcf) of natural gas per day in the NRQ 3151-1X well, from two intervals of Jurassic Lower Safa Formation in the North Ras Qattara Concession in Weste

Tags: production western begins egypt

Category:Energy and Environment

Latest from this category

All news

24.11STEINBACH40
24.11 Sepua Crue F-170
24.11 SECRET
24.11CRAwith
24.1111/15)&&
24.11 8
24.11
24.11F2023 23
Energy and Environment »
24.11STEINBACH40
24.11 Sepua Crue F-170
24.11 SECRET
24.11CRAwith
24.1111/15)&&
24.11 8
24.11
24.11F2023 23
More »