Home Bay Ridge: Mta adding new ramps to Verrazano approach
 

Keywords :   


Bay Ridge: Mta adding new ramps to Verrazano approach

2015-05-01 08:10:34| Railroads - Topix.net

The Metropolitan Transportation Authority is building new ramps to the Brooklyn side of the Verrazano-Narrows Bridge - adding to what the bridge's original engineer called a "spaghetti pile" of existing ascents - in an effort to speed along drivers on the Gordian knot of interchanges tying the bridge to the Belt Parkway and Gowanus Expressway. "The project will involve the construction of a new ramp which will weave its way through the spaghetti pile formed by the existing and complex ramp network forming the Brooklyn approaches to the bridge," according to a memo from Ammann & Whitney, the firm that designed the bridge and which is overseeing construction on the new ramps.

Tags: approach bay adding ridge

Category:Transportation and Logistics

Latest from this category

All news

06.07Tropical Storm Beryl Forecast Discussion Number 30
06.07Summary for Tropical Storm Beryl (AT2/AL022024)
06.07Tropical Storm Beryl Forecast Advisory Number 30
06.07Post-Tropical Cyclone Aletta Graphics
06.07Post-Tropical Cyclone Aletta Wind Speed Probabilities Number 7
06.07Summary for Post-Tropical Cyclone Aletta (EP1/EP012024)
06.07Post-Tropical Cyclone Aletta Public Advisory Number 7
06.07Post-Tropical Cyclone Aletta Forecast Advisory Number 7
Transportation and Logistics »
06.07Tropical Storm Beryl Forecast Discussion Number 30
06.07Summary for Tropical Storm Beryl (AT2/AL022024)
06.07Tropical Storm Beryl Forecast Advisory Number 30
06.07Post-Tropical Cyclone Aletta Graphics
06.07Post-Tropical Cyclone Aletta Wind Speed Probabilities Number 7
06.07Post-Tropical Cyclone Aletta Forecast Advisory Number 7
06.07Post-Tropical Cyclone Aletta Public Advisory Number 7
06.07Summary for Post-Tropical Cyclone Aletta (EP1/EP012024)
More »