Home Boiler for FPSO Vessel Delivered to Hamburg Shipyard
 

Keywords :   


Boiler for FPSO Vessel Delivered to Hamburg Shipyard

2013-07-10 16:54:00| Offshore Technology

MV Frauke, a modern heavy-lift vessel in SAL's fleet since 2008, has delivered a boiler to the Blohm+Voss repair shipyard in the port of Hamburg.

Tags: delivered hamburg vessel boiler

Category:Energy and Environment

Latest from this category

All news

15.112
15.11
15.11 RIDE THE 92 23-24
15.11
15.114m×4m
15.11FG/AG 25.0
15.11
15.11Edwards
Energy and Environment »
15.112
15.11
15.11 RIDE THE 92 23-24
15.11
15.114m×4m
15.11FG/AG 25.0
15.11
15.11Edwards
More »