Home Bridge demolition will be slow-paced, careful in downtown Fresno
 

Keywords :   


Bridge demolition will be slow-paced, careful in downtown Fresno

2016-01-14 01:30:17| Railroads - Topix.net

An artist's rendering of the new Tuolumne Street bridge, which will be constructed higher than the current one to allow for the passage of the high-speed train. Workers from J. Kroeker Inc. work underneath the Tuolumne Street bridge installing bracing Wednesday to protect the railroad tracks below before beginning demolition of the roadway.

Tags: bridge careful downtown fresno

Category:Transportation and Logistics

Latest from this category

All news

15.11Tropical Storm Sara Graphics
15.11Tropical Storm Sara Forecast Discussion Number 6
15.11Tropical Storm Sara Wind Speed Probabilities Number 6
15.11Summary for Tropical Storm Sara (AT4/AL192024)
15.11Tropical Storm Sara Public Advisory Number 6
15.11Tropical Storm Sara Forecast Advisory Number 6
15.11Summary for Tropical Storm Sara (AT4/AL192024)
15.11Tropical Storm Sara Public Advisory Number 5A
Transportation and Logistics »
15.11 DVD-BOX5
15.11 100
15.11NIKE X (27)
15.11 MEMORIA8 HOOD Towel
15.1119HGLEFT
15.11
15.11X-PLUS
15.11 BoU CD
More »