je.st
news
Cut Air Consumption, Part II
2013-08-14 17:17:00| Chemical Processing
Once problems were identified (see the first part of this case study), the project implementation plan included installing: [pullquote] new dryers and mist-eliminating filters; three pressure/flow controllers, one backpressure/flow controller and two 30,000-gal air storage tanks; new piping and retrofits on existing portions of the piping system; a programmable...
Tags: part
air
cut
consumption
Category:Chemicals
Latest from this category |
All news |
||||||||||||||||||
|