Home Design work completed for Gold Line operations campus in US
 

Keywords :   


Design work completed for Gold Line operations campus in US

2013-06-11 01:00:00| Railway Technology

The Metro Gold Line Foothill Extension Construction Authority in California, US has completed the design work, 30% of construction and the majority of the underground utility installation as part of the 24-acre, $265m Gold Line Operations Campus.

Tags: us work line design

Category:Transportation and Logistics

Latest from this category

All news

12.10Atlantic Tropical Weather Outlook
12.10Eastern North Pacific Tropical Weather Outlook
11.10Tropical Storm Leslie Graphics
11.10Tropical Storm Leslie Forecast Discussion Number 38
11.10Summary for Tropical Storm Leslie (AT3/AL132024)
11.10Tropical Storm Leslie Public Advisory Number 38
11.10Tropical Storm Leslie Wind Speed Probabilities Number 38
11.10Tropical Storm Leslie Forecast Advisory Number 38
Transportation and Logistics »
12.10Atlantic Tropical Weather Outlook
12.10Eastern North Pacific Tropical Weather Outlook
11.10Five things we've learned from the Post Office boss
11.10Boeing to axe 17,000 jobs amid strike and quality concerns
11.10Tropical Storm Leslie Graphics
11.10Tropical Storm Leslie Forecast Discussion Number 38
11.10Tropical Storm Leslie Wind Speed Probabilities Number 38
11.10Tropical Storm Leslie Public Advisory Number 38
More »