Home EM&I Groups ODIN Diverless UWILD System Proven to Reduce POB Requirement
 

Keywords :   


EM&I Groups ODIN Diverless UWILD System Proven to Reduce POB Requirement

2014-06-26 18:31:00| Offshore Technology

The EM&I Group was awarded a contract to conduct an underwater inspection in lieu of drydocking (UWILD) using EM&I's ODIN methodology on floating production units (FPU) located in Brazil.

Tags: system groups reduce requirement

Category:Energy and Environment

Latest from this category

All news

23.11contactglove tundratracker
23.11
23.11RUSSELUNO
23.11C282 800yd IP54
23.11X-FLY4 27.5
23.118
23.11 (1~40)
23.1101DVDBOX
Energy and Environment »
23.11contactglove tundratracker
23.11
23.11RUSSELUNO
23.11C282 800yd IP54
23.11X-FLY4 27.5
23.118
23.11 (1~40)
23.1101DVDBOX
More »