Home ENEC installs major components at Unit 4 of Barakah Nuclear Energy Plant, UAE
 

Keywords :   


ENEC installs major components at Unit 4 of Barakah Nuclear Energy Plant, UAE

2017-08-16 01:00:00| Power Technology

Emirates Nuclear Energy (ENEC) has installed the last major components of Unit 4 of Barakah Nuclear Energy Plant in Abu Dhabi, United Arab Emirates (UAE).

Tags: major unit energy components

Category:Energy and Environment

Latest from this category

All news

23.11contactglove tundratracker
23.11
23.11RUSSELUNO
23.11C282 800yd IP54
23.11X-FLY4 27.5
23.118
23.11 (1~40)
23.1101DVDBOX
Energy and Environment »
23.11contactglove tundratracker
23.11
23.11RUSSELUNO
23.11C282 800yd IP54
23.11X-FLY4 27.5
23.118
23.11 (1~40)
23.1101DVDBOX
More »