Home Evraz Steel ordered to remove contaminated soil along Willamette River bank
 

Keywords :   


Evraz Steel ordered to remove contaminated soil along Willamette River bank

2014-12-04 00:21:05| Waste Management - Topix.net

The Oregon Department of Environmental Quality will require Evraz Oregon Steel Mills to remove contaminated soil along the Willamette River bank near its North Portland plant. DEQ announced Evraz must dig down one to five feet below the surface to remove soil contaminated with PCBs and metals, and cover the site with river rock.

Tags: remove bank river steel

Category:Energy and Environment

Latest from this category

All news

15.11
15.11BELLE
15.11 Blu-ray 3
15.11LJN
15.11 vol.8
15.11 Kondo KRS-2552R2HV ICS
15.11 Lunatic Blood / Kleio
15.11111
Energy and Environment »
15.11
15.11BELLE
15.11 Blu-ray 3
15.11LJN
15.11 vol.8
15.11 Kondo KRS-2552R2HV ICS
15.11 Lunatic Blood / Kleio
15.11111
More »