Home Fast-Track Electric Substation Building Facilitates Immediate Power Needs
 

Keywords :   


Fast-Track Electric Substation Building Facilitates Immediate Power Needs

2014-01-23 06:00:00| Industrial Newsroom - All News for Today

As part of a new power CenterPoint Energy Betka Substation project, ECP Tech Services needed to construct a building to hold an electrical substation for its customer Hewlett Packard&mdash;and they needed it quick. <br /> <br /> ECP Tech Services contacted Lonestar Prestress Manufacturing, Inc. (LPMI). LPMI recommended a 20 ft x 80 ft x 12 ft Easi-Span prefabricated two-room building. The building was erected on a poured in place foundation with recesses for wall panels. The walls were made of ...This story is related to the following:Prefabricated Buildings |

Tags: power needs building electric

Category:Industrial Goods and Services

Latest from this category

All news

19.11POWTEX2024 The 25th International Powder Technology Exhibition Tokyo
Industrial Goods and Services »
23.11()PC-88015\"2D
23.11180&100m
23.11kenG
23.11ps3 CECH-4300C HDMI500
23.11 UNDERTALE PIANO SCORE
23.11MM6 BM11-SEC3 LC
23.11
23.11Blu-ray
More »