Home First Installation Completed with Solar FlexRack's New Ballasted Solution, FlexRack Series B Cast in Place, Installed by Turning Mill Energy
 

Keywords :   


First Installation Completed with Solar FlexRack's New Ballasted Solution, FlexRack Series B Cast in Place, Installed by Turning Mill Energy

2016-03-31 12:31:19| Industrial Newsroom - All News for Today

YOUNGSTOWN, Ohio - Solar FlexRack, a division of Northern States Metals and an innovative leader in photovoltaic mounting solutions, announced today the installation of the first solar power generation system which utilizes its new FlexRack Series B3P-X racking system. The B3P-X racking system, together with Solar...

Tags: place series solution energy

Category:Industrial Goods and Services

Latest from this category

All news

01.05Will Artificial Intelligence Be the End of Reps? Part 2
Industrial Goods and Services »
05.05Is Zimbabwe zigzagging into further currency chaos?
05.05Why mortgage rates are going up, not down
04.05This Week in Agribusiness, May 4, 2024
04.05Weekly Recap: Sherwin-Williams, BASF, Abrafati Top This Weeks Stories
03.05'Garden floods show need to work with nature'
03.05Worst-ever job interviews: 'We had to crawl and moo'
03.05Have the wheels come off for Tesla?
03.05BW Converting focuses on time, energy and cost savings at INFOFLEX
More »