Home GBMP Case Study in Lean improves material flow at BioM.
 

Keywords :   


GBMP Case Study in Lean improves material flow at BioM.

2015-01-12 14:31:03| Industrial Newsroom - All News for Today

With funding from Massachusetts Workforce Training Fund grant, GBMP has been helping BiOM learn and apply lean principles and tools to match products with world-class production processes. They are leveraging lean to ensure quality, control costs, and improve delivery and customer satisfaction. In June 2014, BiOM held warehouse kaizen event, facilitated by GBMP Continuous Improvement Manager Dave Wesche, to improve material flow through receiving, incoming inspection, warehousing, and shipping.

Tags: case material study flow

Category:Industrial Goods and Services

Latest from this category

All news

15.09Your MANA RepFinder Profile
Industrial Goods and Services »
29.09Eastern North Pacific Tropical Weather Outlook
28.09Hurricane Isaac Graphics
28.09Hurricane Isaac Forecast Discussion Number 12
28.09Tropical Storm Joyce Graphics
28.09Hurricane Isaac Wind Speed Probabilities Number 12
28.09Hurricane Isaac Forecast Advisory Number 12
28.09Hurricane Isaac Public Advisory Number 12
28.09Summary for Hurricane Isaac (AT5/AL102024)
More »