Home Hawthorne Bridge closed Sunday for lift span work
 

Keywords :   


Hawthorne Bridge closed Sunday for lift span work

2015-11-12 19:46:37| PortlandOnline

The Hawthorne Bridge will be closed to motor vehicles on Sunday, November 15 from 5 am until as late as 5 pm during work on the lift span. Bridge sidewalks will remain open to pedestrians and bicyclists during the work. The drawbridge will be unable to open for river vessels during the work. The bridge will reopen to traffic as soon as the work is completed, which could be as early as noon. The work is not weather dependent.

Tags: work sunday closed bridge

Category:Construction and Maintenance

Latest from this category

All news

»
01.11Getting more out of fall and winter grazing
01.11U.S. Boston butt burger launches in Colombia
01.11All Americans have a role in keeping African swine fever out
01.11BASF TotalEnergies Petrochemicals Receives United Way Champions of Hope Award
01.11US jobs growth slows as presidential election looms
01.11Heritage Environmental Services Secures Commercial Permit Status for Orange, TX Incinerator
01.11Value for Money tsar linked to string of overspends
01.11Gimme Seaweed Partners with rePurpose Global to Combat Plastic Pollution
More »