Home I-10 bridge closure costs trucking industry $2.5M a day
 

Keywords :   


I-10 bridge closure costs trucking industry $2.5M a day

2015-07-23 20:23:37| Trucking - Topix.net

The I-10 Tex Wash bridge closure is adding an additional cost of approximately $2.5 million per day to the trucking industry, according to data collected by the The bridge, which supported eastbound traffic between Southern California and Phoenix, collapsed on Sunday afternoon after flash floods near Desert Center. According to the Los Angeles Times, more than Drivers are being re-routed dozens of miles off-course, which is resulting in hours-long delays that have led to the loss of productivity.

Tags: day industry costs bridge

Category:Transportation and Logistics

Latest from this category

All news

02.11Subtropical Storm Patty Graphics
02.11Subtropical Storm Patty Forecast Discussion Number 1
02.11Subtropical Storm Patty Wind Speed Probabilities Number 1
02.11Summary for Subtropical Storm Patty (AT2/AL172024)
02.11Subtropical Storm Patty Public Advisory Number 1
02.11Subtropical Storm Patty Forecast Advisory Number 1
02.11Tropical Storm Lane Graphics
02.11Tropical Storm Lane Forecast Discussion Number 3
Transportation and Logistics »
02.11Weekly Recap: Nippon Paint, AkzoNobel, PPG Top This Weeks Stories
02.11Subtropical Storm Patty Graphics
02.11Subtropical Storm Patty Forecast Discussion Number 1
02.11Subtropical Storm Patty Wind Speed Probabilities Number 1
02.11Subtropical Storm Patty Forecast Advisory Number 1
02.11Subtropical Storm Patty Public Advisory Number 1
02.11Summary for Subtropical Storm Patty (AT2/AL172024)
02.11Tropical Storm Lane Graphics
More »