Home I-10 bridge closure costs trucking industry $2.5M a day
 

Keywords :   


I-10 bridge closure costs trucking industry $2.5M a day

2015-07-23 20:23:37| Trucking - Topix.net

The I-10 Tex Wash bridge closure is adding an additional cost of approximately $2.5 million per day to the trucking industry, according to data collected by the The bridge, which supported eastbound traffic between Southern California and Phoenix, collapsed on Sunday afternoon after flash floods near Desert Center. According to the Los Angeles Times, more than Drivers are being re-routed dozens of miles off-course, which is resulting in hours-long delays that have led to the loss of productivity.

Tags: day industry costs bridge

Category:Transportation and Logistics

Latest from this category

All news

23.11Atlantic Tropical Weather Outlook
23.11Eastern North Pacific Tropical Weather Outlook
23.11Eastern North Pacific Tropical Weather Outlook
23.11Atlantic Tropical Weather Outlook
23.11Atlantic Tropical Weather Outlook
23.11Eastern North Pacific Tropical Weather Outlook
23.11Atlantic Tropical Weather Outlook
23.11Eastern North Pacific Tropical Weather Outlook
Transportation and Logistics »
23.11
23.11 85
23.11DANCEWITHDRAGON2 811
23.11 N5000VSE
23.11EZY POWER EDIT6
23.11RR4
23.1126.5 HG
23.11VISSLA
More »