Home KiwiRail to begin seismic improvement work at Wellington station
 

Keywords :   


KiwiRail to begin seismic improvement work at Wellington station

2014-02-17 01:00:00| Railway Technology

New Zealand state-owned enterprise KiwiRail Holdings is planning to begin seismic strengthening work at Wellington Railway Station, as part of its plan to make the station more earthquake resistant.

Tags: work begin station improvement

Category:Transportation and Logistics

Latest from this category

All news

06.10Summary for Hurricane Milton (AT4/AL142024)
06.10Hurricane Milton Public Advisory Number 5A
06.10Atlantic Tropical Weather Outlook
06.10Eastern North Pacific Tropical Weather Outlook
06.10Tropical Storm Milton Potential Storm Surge Flooding Map
06.10Tropical Storm Milton Probabilistic Storm Surge Graphics
06.10Summary for Tropical Storm Milton (AT4/AL142024)
06.10Tropical Storm Milton Public Advisory Number 5
Transportation and Logistics »
06.10Hurricane Milton Public Advisory Number 5A
06.10Summary for Hurricane Milton (AT4/AL142024)
06.10Atlantic Tropical Weather Outlook
06.10Eastern North Pacific Tropical Weather Outlook
06.10Glatfelter Develops Biobased Espresso Lid Material
06.10Tropical Storm Milton Potential Storm Surge Flooding Map
06.10Tropical Storm Milton Probabilistic Storm Surge Graphics
06.10Firms urge mayor to rethink congestion charge plan
More »