Home Lane closures for Broadway Bridge repairs begin June 26
 

Keywords :   


Lane closures for Broadway Bridge repairs begin June 26

2017-06-20 20:23:47| PortlandOnline

The two outside traffic lanes on the Broadway Bridge will close on Monday, June 26 after 9 a.m. for a six-month project that will replace four large steel wheels that help open and close the drawbridge for ships to pass.

Tags: june begin bridge lane

Category:Construction and Maintenance

Latest from this category

All news

»
21.05Eastern North Pacific Tropical Weather Outlook
21.05Atlantic Tropical Weather Outlook
20.05Dantex USA appoints Rob Tolland VP of sales
20.05MDARD designates two bovine tuberculosis testing areas
20.05USDA moves to electronic identification tags
20.05Better pasture and hay conditions anticipated for 2024
20.05Panasonic offers Fire TV, Google TV and Powered by TiVo
20.05Eutelsat reports results for the period ended 31 March 2024
More »