Home Morrison Bridge Saturday closure to install drawbridge parts
 

Keywords :   


Morrison Bridge Saturday closure to install drawbridge parts

2017-11-03 18:26:15| PortlandOnline

The Morrison Bridge will be closed to all traffic on Saturday, November 4 from 6 a.m. until as late as 6 p.m. to allow a contractor to install parts on the drawbridge that were removed during this years repairs.

Tags: parts saturday bridge install

Category:Construction and Maintenance

Latest from this category

All news

»
27.04Commentary: Committed to End Plastic Waste
26.04Dead whistleblower accused Boeing of safety breaches
26.04Introducing Mens Hybrid Skincare Brand Enhanse
26.04Washington Corner April 2024
26.04Does history repeat itself?
26.04FDA finalizes guidance to provide further clarity on Veterinary Feed Directives
26.04Post Office paid widow in instalments for silence
26.04NCBA statement on USDA final traceability rule
More »