je.st
news
Morrison Bridge closed Sunday, May 3 for lift span work
2015-04-29 20:23:50| PortlandOnline
The Morrison Bridge will be closed to motor vehicle traffic on Sunday, May 3 from 7 a.m. until as late as 7 p.m. during an inspection and maintenance work on the lift span deck. The work is related to problems with deck panels that were installed in 2011 2012. The bridge will remain open to bicyclists and pedestrians during the work.
Tags: work
sunday
closed
bridge
Category:Construction and Maintenance