je.st
news
NW District Sewer Replacement Project - Proposed Change Noise Variance
2016-02-02 17:57:03| PortlandOnline
Environmental Services has completed design of a project to replace about 8,000 feet of sewer pipe that is in poor condition. The pipes range in size from eight to 36 inches. The project will increase sewer system capacity and help prevent sewer backups in basements. The project is anticipated to start this summer and the entire project timeline is 18 months.
Tags: change
project
district
proposed
Category:Construction and Maintenance
Latest from this category |
All news |
||||||||||||||||||||
|
|