Home NW Hermosa Sewer Repair Project Update: April 29, 2016
 

Keywords :   


NW Hermosa Sewer Repair Project Update: April 29, 2016

2016-05-02 22:48:36| PortlandOnline

Environmental Services is working on a project to repair 100-year old sewer pipes along NW Hermosa Boulevard between NW Macleay Boulevard and NW Monte Vista Terrace. Since the project began in late March, crews have installed six manholes and repaired laterals that connect properties to the sewer. Crews are replacing stormwater inlets and inlet pipes that connect to the combined sewer system. Next crews will repair over 550 feet of public sewer main in the street.

Tags: april project update repair

Category:Construction and Maintenance

Latest from this category

All news

»
06.07Axalta Schedules Second-Quarter 2024 Earnings Conference Call
06.07Tropical Storm Beryl Potential Storm Surge Flooding Map
06.07Tropical Storm Beryl Probabilistic Storm Surge Graphics
06.07Tropical Storm Beryl Graphics
06.07Tropical Storm Beryl Forecast Discussion Number 32
06.07Tropical Storm Beryl Storm Surge Watch/Warning Map
06.07Tropical Storm Beryl Wind Speed Probabilities Number 32
06.07Tropical Storm Beryl Forecast Advisory Number 32
More »