Home National Grid Announces Draft Route and Substation Site
 

Keywords :   


National Grid Announces Draft Route and Substation Site

2013-09-26 21:34:00| Transmission & Distribution World

National Grid announced a preferred substation site and draft route to connect proposed wind farms in Mid Wales, which includes putting the connection underground for 8 mi in the Meifod Valley about one quarter of the 33-mi route. read more

Tags: site national route draft

Category:Electronics and Electrical

Latest from this category

All news

»
25.11dura ace 32H
25.11 (S)
25.111592 33mm 33mm
25.11 DVD 7
25.11DR4270
25.11A +A act2
25.115 SEED FREEDOM
25.11
More »