je.st
news
National Grids Subterranean Engineers Prep for Last Big Dig on London Power Tunnels
2014-09-12 05:14:00| Transmission & Distribution World
National Grid is set to begin the final phase of tunneling on its flagship London Power Tunnels project. Manned Tunnel Boring Machine (TBM) Evelyn recently completed a challenging 3.4-km stretch of the tunnel underneath the River Thames between Wandsworth and Earls Court. read more
Tags: power
big
national
london
Category:Electronics and Electrical
Latest from this category |
All news |
||||||||||||||||||||
|
|