Home Ramp to Hwy. 43 south to close for Sellwood Bridge work
 

Keywords :   


Ramp to Hwy. 43 south to close for Sellwood Bridge work

2013-08-29 00:56:40| PortlandOnline

The ramp from the Sellwood Bridge to Highway 43 southbound will close on Tuesday, September 3 at 6 a.m. to allow for construction of a new interchange. After the closure, motorized bridge traffic will need to travel north to a new turnaround at SW Taylors Ferry Road to access southbound Highway 43.

Tags: work close south bridge

Category:Construction and Maintenance

Latest from this category

All news

»
15.11
15.11 BLOOD &DEATH HISTORY
15.113
15.11 squier Jazzmaster
15.11 SS6
15.11
15.11pen20087
15.11/
More »