Home Seismic retrofit project underway on West Branch Feather River bridge
 

Keywords :   


Seismic retrofit project underway on West Branch Feather River bridge

2013-10-01 10:27:19| Railroads - Topix.net

A $10.7 million project to seismically retrofit the West Branch Feather River bridge that was on hold for a long time is underway on Highway 70 near Yankee Hill, about a dozen miles northeast of Oroville.

Tags: west project river bridge

Category:Transportation and Logistics

Latest from this category

All news

01.07Hurricane Beryl Graphics
01.07Summary for Hurricane Beryl (AT2/AL022024)
01.07Hurricane Beryl Public Advisory Number 11A
01.07Atlantic Tropical Weather Outlook
01.07Eastern North Pacific Tropical Weather Outlook
01.07Tropical Depression Chris Graphics
01.07Tropical Depression Chris Public Advisory Number 3A
01.07Hurricane Beryl Forecast Discussion Number 11
Transportation and Logistics »
01.07Hurricane Beryl Graphics
01.07Hurricane Beryl Public Advisory Number 11A
01.07Summary for Hurricane Beryl (AT2/AL022024)
01.07Atlantic Tropical Weather Outlook
01.07Eastern North Pacific Tropical Weather Outlook
01.07Tropical Depression Chris Graphics
01.07Tropical Depression Chris Public Advisory Number 3A
01.07Union expected to call off Port Talbot strike action
More »