Home Southeast Interceptor Sewer Repair Project: Construction update
 

Keywords :   


Southeast Interceptor Sewer Repair Project: Construction update

2017-10-18 17:14:42| PortlandOnline

Construction continues on an Environmental Services project in inner southeast Portland to repair the deep, large-diameter Southeast Interceptor sewer line that is deteriorating due to age. The repairs will extend the life of the sewer and protect public health, water quality, and the environment.

Tags: project update construction repair

Category:Construction and Maintenance

Latest from this category

All news

»
05.11Tropical Storm Rafael Graphics
05.11Tropical Storm Rafael Wind Speed Probabilities Number 7
05.11Tropical Storm Rafael Public Advisory Number 7
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
05.11Tropical Storm Rafael Forecast Advisory Number 7
05.11Boeing strike ends as workers back 38% pay rise deal
05.11Tropical Storm Rafael Public Advisory Number 6A
05.11Summary for Tropical Storm Rafael (AT3/AL182024)
More »