Home Southeast Interceptor Sewer Repair Project: Construction update
 

Keywords :   


Southeast Interceptor Sewer Repair Project: Construction update

2017-10-18 17:14:42| PortlandOnline

Construction continues on an Environmental Services project in inner southeast Portland to repair the deep, large-diameter Southeast Interceptor sewer line that is deteriorating due to age. The repairs will extend the life of the sewer and protect public health, water quality, and the environment.

Tags: project update construction repair

Category:Construction and Maintenance

Latest from this category

All news

»
20.05Canada invests over $9.6M to prevent, prepare for African swine fever
20.05Dabbagh Named General Manager of Waldencast Ventures Glaze Brand
20.05Several pork priorities secured in House Farm Bill
20.05BT scraps digital landline switch deadline
20.05Essie Introduces Nail Art Studio
20.05Ilia Beauty Introduces Vegan Lip Sketch Hydrating Crayon
20.05Summer interest rate cut possible, says Bank deputy
20.05Eastern North Pacific Tropical Weather Outlook
More »