je.st
news
Stansted Airport Track Transit System
2015-06-17 15:40:00| Airport Technology
Firstco have been awarded a Manchester Airport Group contract to replace the Automatic Train Operation central control system of the driverless Track Transit / People Mover system at Stansted Airport.
Tags: system
track
airport
transit
Category:Transportation and Logistics
Latest from this category |
All news |
||||||||||||||||||
|