Home Storefront Framing helps users keep to construction schedules.
 

Keywords :   


Storefront Framing helps users keep to construction schedules.

2016-01-19 14:31:06| Industrial Newsroom - All News for Today

Available for commercial interiors, INT45 Interior Flush Glaze Framing incorporates aluminum storefront with metal stud and drywall systems. Adapters allow INT45's frames to be installed before or after drywall while completely covering end of the stud wall and helping meet construction schedules. For facilitated and accelerated installation, perimeter trim members are pre-applied on one side of 4.5 in. frame opening. Gaskets accommodate 0.25–0.5 in. thick glass and come in black or gray.

Tags: users construction helps schedules

Category:Industrial Goods and Services

Latest from this category

All news

19.11POWTEX2024 The 25th International Powder Technology Exhibition Tokyo
Industrial Goods and Services »
23.11 #249
23.11muta5
23.1120
23.11BabolaT VS BUG4300 24ss
23.11
23.11 TYO26cm
23.112
23.11CW-X 2.0
More »