je.st
news
Target Energy Limited Provides Update on Fairway Project
2013-11-28 00:57:18| Industrial Machines - Topix.net
Darwin #3 continues to flow back oil and load-water following the frac over the lower Wolfberry section.
Tags: limited
project
update
energy
Category:Industrial Goods and Services
Latest from this category |
All news |
||||||||||||||||||||||
|
|