Home Traffic Alert -- Sellwood Bridge closed July 28-31 for paving
 

Keywords :   


Traffic Alert -- Sellwood Bridge closed July 28-31 for paving

2016-07-28 23:15:36| PortlandOnline

The Sellwood Bridge will be closed to all traffic modes from 6 am on Thursday, July 28 until 6 am on Sunday, July 31 to allow a contractor to pave the east approach and the interchange ramps and through lanes of Highway 43 at the west end of the bridge.

Tags: july closed alert traffic

Category:Construction and Maintenance

Latest from this category

All news

»
23.11()PC-88015\"2D
23.11180&100m
23.11kenG
23.11ps3 CECH-4300C HDMI500
23.11 UNDERTALE PIANO SCORE
23.11MM6 BM11-SEC3 LC
23.11
23.11Blu-ray
More »